20.8 C
London
Friday, April 12, 2024
HomeEntertainmentSchwarzenegger Snaps Back at SoCalGas Over ‘Pothole’ Repair

Schwarzenegger Snaps Back at SoCalGas Over ‘Pothole’ Repair

Date:

Related stories

Delusional, or prophetic? One IDF general warned a massacre would happen

Most dismissed retired IDF general Yitzhak Brick’s warning earlier...

Social media posts by Tajik president’s grandson unsettle ruling circles as leadership succession looms

Dushanbe 25/2 (35.71) The social networking activity of "influencer" Ismoil...

Joe Biden trails behind Donald Trump in six states, opinion poll reveals

Ahead of the upcoming US election scheduled for November,...

Sri Lanka ends visas for hundreds of thousands of Russians staying there to avoid war

Sri Lanka has told hundreds of thousands of Russians and...
spot_imgspot_img

Movie star and former California governor Arnold Schwarzenegger went viral on Tuesday for posting a video of him personally filling what he said was a pothole that had been bothering him and his neighbors in Brentwood “for weeks.”

But as it turns out, the hole was not technically a pothole. 

The video, which has amassed over 11 million views since it was posted on Tuesday afternoon, shows the “Terminator” actor filling the rut with pre-packaged blacktop. 

“I always say, let’s not complain, let’s do something about it,” Schwarzenegger tweeted

However, the hole that was pestering drivers wasn’t there by accident. According to a statement from SoCalGas, it was an active service trench. 

“This location is a utility trench that relates to active, permitted work being performed at the location by the Southern California Gas Company,” SoCalGas said in a statement to KTLA. “(Workers) placed a temporary asphalt surface, which will then be replaced with a permanent asphalt surface when their permitted work is complete.” 

The utility said crews completed work to upgrade the pipeline system on Mandeville Canyon Road on Jan. 26. As part of their maintenance process, permanent paving takes place approximately 30 days from the project’s completion, but “the recent extraordinary wet and inclement weather delayed the ability to perform the permanent paving,” the utility said.Potholes again causing problems for drivers across Southern California

The “Governator” fired back on Thursday, saying pothole or not, the hole had been there too long.

“So everyone knows, the pipeline work was finished in January. Apparently, they thought it was a good plan to take six months to cover the trench, so I just did them a favor,” Schwarzenegger tweeted. “And why don’t they talk about the second pothole I filled?”

Source: KTLA

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from up to 5 devices at once

Latest stories

spot_img